# Week of June 9, 2026

> From rules to governed decisions: compliance-gap analysis, closing the propose-approve-sign loop, handling rule changes, and the interpretive layer as structure.

## Summary

We turned the rules-and-retrieval foundation into governed engineering decisions. The
system can now answer "which rules apply to this vessel," with citations, and record
that answer as a signed, auditable decision. We shipped compliance-gap analysis that
only ever proposes findings for a human, closed the loop from AI proposal to
human-approved signed record, built the safeguard for when a rule changes, and started
turning the interpretive layer a shipyard owner described into real structure. With
that, [M2](/how-it-works/build-path), governed decisions, is complete.

## What we shipped

Milestone [M2](/how-it-works/build-path).

* A **citation manager** that guarantees every rule claim links back to its source,
  enforced as a gate, plus **rules search** that returns the likely-applicable rules for
  a vessel ranked by relevance, each with its citation and confidence, completing the
  Rules & Retrieval milestone.
* **Prior-vessel memory**: a yard's own past vessels captured as private, searchable
  precedent, the basis for "we have built something like this before."
* The **decision ledger** made append-only and tamper-evident, with a gate runner that
  blocks rather than silently skips and a single choke point for emitting a decision.
* **Compliance-gap analysis**: the AI compares what a rule requires against the evidence
  a vessel actually has and flags the gap as a possible finding for review. It never
  issues a compliance verdict on its own. A companion **evidence-matching** capability
  lines up existing evidence against what each requirement asks for. Both are review-only
  and citation-checked.
* A **review queue and promotion path**: a proposal lands in a yard-owned staging area,
  a person reviews it, and only an approved item becomes a permanent record and signed
  engineering decision, written through the single choke point that enforces the gates,
  the human approval, and the signature together.
* The **first operator signing tool**: a command-line surface where a real person
  enrolls as a signer, signs an approved decision, and verifies that it replays exactly
  from what was stored. **Local key custody** keeps each signer's keys on disk behind a
  swap-able seam (for managed or hardware-backed storage later). One signature covers the
  whole record: who decided, who approved, and what was approved.
* A **supersession record and re-evaluation queue**: when a rule is superseded, every
  signed decision that relied on it is found and flagged for re-approval, matched by a
  stable citation path that survives renumbering. The original signed decision is never
  edited. Its as-approved state is kept forever and the change is recorded alongside it.
  Routing is graded: some superseded rules grandfather automatically, others raise an
  engineer-review task, others force a re-approval.
* The start of the **interpretive layer as structure**: authority tiers on every source
  (codified regulation, NVIC, marine technical note, policy letter, Marine Safety Manual),
  interpretation links recording that one document interprets or clarifies another, and
  an interpretive-guidance reader that parses a Coast Guard circular into citable rules.

## What we learned

* **A confident "this complies" answer the system cannot actually prove is the exact
  failure we are building against.** Deciding whether a rule is satisfied is a matter of
  judgment, so we deliberately avoided producing a tidy automatic compliance verdict.
* **The official MSC Plan Review Guides are "unofficial cheat sheets"** a reviewer leans
  on, useful as an index into the rules, never legally binding. So the structure keeps
  the cheat sheet and the actual authority clearly apart.
* **Keeping the signed record immutable shaped the whole design.** The current status of
  a decision lives in a separate projection, so a later change never overwrites the
  history of what was approved and why.
* **A code review caught a cross-tenant leak** where a global rule change was about to
  expose one yard's list of affected decisions to others. We fixed it before it could
  matter and extended the immutable-isolation tests to cover the new tables.
* **A design-basis letter**, the engineering justification a yard writes for a novel
  vessel with no prescriptive rule, is already expressible as one of our signed
  decisions, so it needs no new artifact type.
* **A second field meeting** (Conrad's design and estimating leads) gave the interpretive
  layer back in their own words and added that local Coast Guard offices interpret the
  same rule differently by region, so an interpretation can depend on the issuing office,
  not only on the vessel.

## Blockers & open questions

* The compliance-gap capability is built and tested end to end but has little real data
  to work on until the Plan Review Guides are ingested and the vessel side is populated,
  and the vessel side depends on the geometry work in M3. Connecting evidence to the
  vessel it belongs to is left for M3, where design objects and CAD data live.
* **Production key custody** (managed key services, hardware-backed signing) is
  deliberately deferred. The local keystore fits the current local workflow, and the
  swap-able seam is what keeps a development shortcut from quietly becoming the
  production path.
* The signing tool consumes an already-approved decision rather than offering a full
  review screen. The richer review-and-approve interface waits for the structured web UI
  in a later milestone.
* The **NVIC 9-97 proof case** (structural fire protection, where reading the regulation
  alone gives the wrong answer) is still gated on a walkthrough with the owner. We built
  the structure and tested it on synthetic interpretive text; we will not claim the
  finished regulation-to-guidance proof until the source and walkthrough are in hand.
* How to represent regional office differences is still open. The link model has room for
  an office qualifier; the decision waits until the interpretation graph is actually
  traversed in M3.

## Next week

* Begin the geometry baseline (M3), starting with the breakdown the yard actually works
  in: the work package against a product-oriented structure, then the data backbone
  for measurements.